Build Each Product Where It Earns the Most

When the same product can be made on several lines or in several plants, the allocation decides cost, lead time and service level. The options multiply with every product, period and capacity limit.

Talk to Planck
Plant A Plant B Plant C Orders in, allocated by plant

Production Allocation Across Plants

The decision
How much of each product to build on each line in each period.
What makes it hard
Line capacity, changeover costs, material availability, demand and service targets, with costs that do not scale linearly.
Benefits
Lower production cost and better service levels, with each product built on the line and in the plant where it earns the most.
Also in scope
Line sequencing, build-and-allocate planning and supply decisions under capacity limits.

Other Solutions

Defense Space Energy and grid Logistics and field services Finance

Optimize Production Across Plants

Planck allocates production across plants, lines and shifts to meet demand at lower cost.

Talk to Planck
Talk to Planck Book 15 minutes with the founder